← Al Davies, 250 High Street

How to add a parallel branch in Power Automate

To add a parallel branch, select the down arrow between two cards, select the plus sign that appears, and choose Add a parallel branch. Then add an action to the new branch. Microsoft says the flow continues only after all parallel steps are complete.

How do I add a parallel branch?

  1. Open your cloud flow in the designer.
  2. Select the down arrow between two cards.
  3. Select the plus sign that appears on the arrow. Right-click also works.
  4. Select Add a parallel branch.
  5. Search for the action you want in the new branch and set it up, such as a second approval like the ones in this invoice approval flow.

Where do I add steps afterward?

Two plus buttons behave differently. The small Insert a new step button above or below a card adds a step to that one branch.

The larger New step button at the bottom of the whole flow adds a step that runs after all previous branches complete. That is how you merge branches: put the joining step under the New step button.

When is a parallel branch worth it?

What is the difference from Apply to each concurrency?

By default, Apply to each handles one item per turn. Microsoft says you can set the degree of concurrency from 1 to 50, and that a high number such as 50 may not run faster because of extra overhead. Its example for an array of 4 items:

Array lengthDegree of parallelismTime to run loop
4Off21 seconds
4211 seconds
446 seconds
466 seconds

Concurrency works only at the top level of a flow; inside a nested Apply to each, the inner actions always run in order. Microsoft's concurrency examples include bulk email, record updates in Dataverse, SharePoint and SQL, bulk user creation in Microsoft Entra ID, and parallelized approvals.

What can go wrong?

As of November 2026, Microsoft warns about skipped actions. A skipped action is one that did not run because a condition was not met, and many of them make a flow hard to read. Its advice for switch branches is to call child flows rather than stack many single actions in each branch.

Parallel branches are not the same as concurrency in an Apply to each loop. See our Apply to each concurrency guide. The click path above follows the classic designer, so screens may differ.

Want a flow that finishes sooner?

Al Davies builds tools that cut busywork and missed steps for teams. The first call is free and takes 45 minutes. Bring the steps of one flow that feels slow.

FAQ

Do steps after the branches wait for all of them?

Yes, if you add them with the New step button at the bottom of the flow. Microsoft says those steps run after all previous branches complete.

Can a branch hold more than one action?

Yes. Use the Insert a new step button below a card to add a step to that branch.

Is a parallel branch the same as concurrency?

No. Concurrency is a setting on an Apply to each loop. A parallel branch runs separate actions side by side.

What range can I set for concurrency?

Microsoft says concurrency can be set from 1 to 50 on an Apply to each loop.

Sources